Maintain or restore a trail tread (the footpath surface) which is safe for users and prevents the deterioration of the trail resources.
All maintenance activity expected to occur outside of the original footpath and associated water control features must have park-wide project clearance completed and approved. Use of natural materials is required in trail construction work; use of dimension lumber is discouraged and use of pressure treated or creosote treated lumber is not permitted.

Annual maintenance may be sufficient; sections with unusual problems may require additional maintenance. The prevention of resource damage (erosion) should dictate the frequency of maintenance, with minimal amount of work.
All waterbars should be cleaned and restored at least once each year due to erosion damage and wear from heavy foot.
The following are good sources for tread fill material:
The source for tread material needs beyond the above must be approved by park staff. Borrow pits are not to be dug. Any disturbance of the soil beyond the trail tread, berms, and associated water control features itself must have project clearance.
Subscribe now to receive our free and infrequently issued HTML e-mail newsletter.
Sign up!Potomac Appalachian Trail Club
Supervisor of Trails
118 Park Street SE
Vienna, Virginia 22180
703.242.0963
District Manager
Don White
Richmond, Virginia
804.795.2914
Content published on this Web site is protected by copyright and may be downloaded or copied only for personal, noncommercial, use and may not be otherwise reproduced or published without express, written permission.